Skip to content
K.G. RubberPRODUCTS

Quality

Quality built into every batch

From raw material to dispatch, every stage is checked — so the parts you receive match the parts you approved.

  • ISO 9001:2015 CertifiedCertificate No. QM 08 01665 · Valid until 18 November 2027

Quality process

5 checkpoints between raw material and your door

  1. 01

    Incoming inspection

    Raw materials and metal inserts are checked against specification before use.

  2. 02

    First-in, first-out verification

    Materials are used in strict FIFO order, so every batch is fresh and traceable.

  3. 03

    In-process inspection

    Parts are checked at defined intervals throughout every production run.

  4. 04

    100% visual inspection

    Every single part is visually inspected for defects before it moves on.

  5. 05

    Final inspection

    Dimensional and visual inspection against your drawing before packing and dispatch.

Testing & inspection

Measured, not assumed

Every batch is checked for hardness, and finished parts are measured against your drawing. Inspection reports, material test certificates and compliance documents are available on request.

  • Hardness tester

    Shore A hardness of every batch

  • Ageing oven

    Heat-ageing performance

  • Non-contact measuring

    Precise dimensions without distorting soft parts

  • Vernier calipers

    Dimensional inspection

Recognition

Recognised by our customers

Need test reports or compliance documents?

Tell us your documentation requirements along with your enquiry and we’ll include them in our quote.